This is the last month of winter, and just before spring. It wasn't too cold, but wasn't warm enough either. Actually there was only one nice weekend and I took the opportunity to work on the board. I spent one weekend on fabrication of the mainsheet track bridge. It was done in my basement.

It looks like it is time to clean a little
I did try dry fit of the navigation table. In my opinion it fits perfectly. I'm planning to have a four drawer cabinet under this table. The board is large and there is enough room for a left elbow. There is plenty of room under the table as well.
I did install my microwave.

Perfect spot for both of them.

First assembly
I spent some time figuring out the bridge concept. Finally I decided to use a 4X4 aluminium beam. To fit the bridge nicely with curved wheelhouse top, I had to cut the beam in the arc shape. It wasn't too tough but it was time consuming. I used a jigsaw for this job.
In curved area the flat plate to be welded

Now is not so stiff with missing bottom part

Ready for welding
Ends look almost professional :-)